Center for Architecture galleries will close early at 5pm on Friday, May 22, and close on Monday, May 25, in observance of Memorial Day. We are open regular hours (11am–5pm) on Saturday, May 23.
New York City Energy Conservation Code (NYCECC) Commercial Envelope (IIA) Progress Inspection Requirements
Mar 03 - Mar 04, 2025
Share
+ Add to Calendar
2025-03-03 08:00:002025-03-04 12:00:00America/New_YorkNew York City Energy Conservation Code (NYCECC) Commercial Envelope (IIA) Progress Inspection RequirementsAgenda – Monday, March 3, 2025: 1 RCNY 101-07 Approved Agencies Rule: What is the role of the TR8 inspector of record? Supervision Duties Confirm that the documents are sufficient Verify that the drawings represent the built conditions Certification with exception(s) Conflict of interest 1 RCNY 101-07 Approved Agencies Rule: What Should Be Included in Inspection Reports Non-compliant conditions and remediation Photographic documentation Signature and seal of the responsible design professional S
Online
Mar 03 - Mar 04, 2025
3/3/25, 8am - Tuesday, 3/4, 12pm
Location
Online
7 LU / 7 HSW
Agenda – Monday, March 3, 2025:
1 RCNY 101-07 Approved Agencies Rule: What is the role of the TR8 inspector of record?
Supervision
Duties
Confirm that the documents are sufficient
Verify that the drawings represent the built conditions
Certification with exception(s)
Conflict of interest
1 RCNY 101-07 Approved Agencies Rule: What Should Be Included in Inspection Reports
Non-compliant conditions and remediation
Photographic documentation
Signature and seal of the responsible design professional
Sampling
Table II of 1 RCNY §5000
IIA1 Protection Of Exposed Foundation Insulation
Protective coverings
Coordination with COMcheck
IIA2 INSULATION PLACEMENT AND R-VALUES
Prescriptive compliance vs COMcheck
Allowed COMcheck versions
EN1 energy model documentation
Other wall entries in COMcheck
Properly installed insulation
Identifying thermal bridging
Cavity vs continuous insulation
Verifying installed R-values
Comparing built conditions to details and to COMcheck
Understanding area weighted U-factor calculations
Slabs on grade
Balconies and parapets
Reading thermal boundary diagrams
Gas meter and vented mechanical rooms
Heating outside the building
Reading area elevation diagrams
IIA3 Fenestration and door U-factor and product ratings
NFRC testing
Identifying valid fenestration labels
Unit/assembly vs center-of-glass values
How to verify values when there is no valid label
Entrance doors vs non-entrance doors
IA4 FENESTRATION AIR LEAKAGE
Valid labeling
Energy Star vs NFRC
IIA5 FENESTRATION AREAS
Verifying dimensions
Sampling
COMcheck vs prescriptive compliance
Agenda – Tuesday, March 4, 2025:
IIA6 Air Sealing And Insulation – Visual Inspection (2016)
IIA6 Air Barrier Visual Inspection (2020)
Air barrier types
Sealing at gas meter and vented mechanical rooms
Inspection of joints, seams, and penetrations
Identifying defects
Observation of air sealing (blower door) testing
IIA7 Air Sealing And Insulation-Testing (2016)
IIA7 Air Barrier-Testing (2020)
Blower door testing basics
Role of the TR8 inspector
Commercial code vs residential code requirements
Testing plan
Apartment sampling
Enclosure area
Building preparation
During the test- what to look for
Test reports- what to include
IIA8 Air Barrier Continuity Plan Testing (2020)
What buildings need to comply?
Air barrier vs. vapor barrier
Test or inspect?
Air barrier characteristics
ASTM standards
What the design applicant should provide in the ABC plan
Best TR8 inspection practices for carrying out the ABC Plan
Our website has detected that you are using a browser that will prevent you from accessing certain features. An upgrade is recommended to experience. Use the links below to upgrade your exisiting browser.